Wednesday, June 15, 2011

WIP1 :: HGUC 1/144 KSHATRIYA


This will be a very short lead time project that target to be finished in 20days, to meet ZeroG forum Group  build due date :p 
Progress so far, trim the 4 huge binder to enable a open funnel hatch.





The mechanism:
The binder cut out attached to the cut-out funnels portion of inner bracket.

A 1mm metal rod glued as hinge for the hatch to slide along.

Position 1 (closed)
 Position 2
 Position 3 (fully opened)




Stressed .. when u have to repeat the same thing for another 3 ... =_=

Thanks for reading :)

8 comments:

  1. Whoa! just a simple cutting can make the whole impression up a notch! Brilliant!

    ReplyDelete
  2. WY
    Your work modelling are prefect.

    ReplyDelete
  3. Bro, wht do you use to cut it. Can u give us how by pictures? :)

    ReplyDelete
  4. Hi richko,
    Sorry no photos for how it done .
    By using panel line chisel , drag along the line until it thin enough , then slice through with cutter .
    Hope this help ;)

    ReplyDelete
  5. Thanks juliuslim
    I just wondering around for an idea how to make my brand new hguc kshatriya cool. And i saw yours... And now im your fan. Im from indonesia btw.. Nice to know you

    ReplyDelete
  6. Many thanks for the kind words , Richko :)

    ReplyDelete
  7. I'm so amazed how this kit turned out to be a badass kit even though it is still in process...keep us posted please!

    ReplyDelete

Related Posts Plugin for WordPress, Blogger...